Indiana Large Scale RailroadersGarden Railroading in Indiana
Indiana Large Scale Railroaders
← Members' LayoutsFrom the club's old website · May 13, 2011 · David Palmeter

Slusser Railroad

Bob and Judy Slusser

Indiana Large Scale Railroaders

Photos from Bob Posted March 6, 2010

David;

I began my outdoors garden railroad the spring of 2008 after reading about garden railroads the prior winter. The railroad was designed to be a temporary installation as I thought I would be moving by fall 2009 and the property is a rented apartment. I'm still at this location, but will probably be moving the fall of 2010. I'm a construction superintendent with a permanent home in Florida and move from place to place, as I'm assigned projects to complete.

I purchased a starter set from Bachmann for $169.00, picked an HO scale layout, 4×8, from Model Railroader's plans and modified it, 18×32. The mainline run of 136 feet, folded dogbone. All is removable with no modification to the landscape when we leave, a few spots of grass seed will be required to repair the yard.

Power is track power, DCC with QSI sound installed in the locomotive, rolling stock is; three passenger cars, one caboose and nine assorted freight cars. Plans for 2010 are for the addition of some switches, buildings and maybe a water feature.

Bob Slusser

Below are p ictures of my garden railroad ( most of my 2009 pictures were lost thanks to a hard drive crash).

Slusser Railroad

10 may 08, 033 – the future railroad was staked out.

Slusser Railroad

10 may 08, 034 – roadbed is being placed. Notice the BNSF train going past. My railroad is about 150 feet south of a double track N&S mainline on which trains run about every 10 to 15 minutes.

Slusser Railroad

24 May 08, 005 – wood sub roadbed is complete ready for attachment to the ground.

Slusser Railroad

14 June 08, 021 – wood sub roadbed has been installed to grade and track is being attached.

Slusser Railroad

28 June 08, 016 – bridges are being installed and we are running trains.

Slusser Railroad

July 08 – trestle over river is under construction. Mountains are window screen over stakes, painted and covered with vine plants. Additional pictures (below) are of the two through truss bridges on the railroad. These bridges were cut from plywood and painted; 2010 is their third winter and show no signs of delamination.

January 09 – snow scene, all operations have been suspended.

Slusser Railroad

July 4 th 09 – overall picture of railroad, some plants have taken hold, sedum and various low flowers at tracks and morning glories, these have not yet spread to cover mountains.

25 Sept. 09, 014, 015, 016, 017, the four pictures above, taken early evening, show some landscaping and 3D backdrops.

Excellent, Bob. It is particularly interesting to see the process involved with this unique "removable" railroad. David

Want to see a layout in person?

Street addresses are shared only with club Members. Sign in to see them on the Members' Layouts map, or join the club. Open houses and Layout Tours are listed on Events.

Slusser Railroad · ILSR